Time for a quick update in this, hardly touched this over Christmas and through January, saved me a bloody fortune!! Back on it now i've stocked up on some parts from BMW and ECP, I have chosen the sensible option of listening to Andy getting some new rear handbrake shoes ;)
Car is now up on 4 axle stand so i can make a start on stripping the floor pan where necessary and repainting it. The old struts have now been removed and stipped down ready for the new ones to be rebuilt and the shocks and springs swapped over, just need a 36mm socket to tackle the wheel bearing
Old struts nearly finished being stripped, actually in decent condition, disc backing covers seem fairly solid.
Amazing how the proper tool makes short stress free work of a job, big thanks to Andrew (Demlotcrew) for lending me the tool.
Powdercoated strut and disc backing ready for the wheel bearing to go on tomorrow, is it ok to tap that on or do i need somekind of puller?
