small DRIFT

Uploaded with ImageShack.us



Uploaded with ImageShack.us

Uploaded with ImageShack.us
Project M52B28TU

Target new BBS RZ 8.5J et13 wheel

They were supposed to be BBS RM


Swap


After four days...


a differential gear reached about the 3.25 correlation
first launching
Long expected final effect...

Uploaded with ImageShack.us

Uploaded with ImageShack.us

Uploaded with ImageShack.us

Uploaded with ImageShack.us

Uploaded with ImageShack.us

Uploaded with ImageShack.us






























