Another update today:
Unbolted the whole front subframe and shock assembly / engine and gear box to finally install the clutch. Turned out the first time we attempted (at 1am in the morning I might add) we bumped the alignment tool and just couldnt get the input shaft into the spigot bearing on the crank. Today was pretty challenging as well, took us 5 goes and 3 practice runs before we could get it in and the gearbox fully on with torqued and loctite'd pressure plate bolts.
anyways .. some cool shots of the engine and suspension.
A video of us dropping it out.
http://www.youtube.com/watch?v=GFuU--mMPRU
Prep work.
and out she comes
gearbox / clutch mounting time..
All a bit of a tight fit in the bell housing. But its finally in!
Took the time to tidy up a few other things while the engine was out
Put the new copper nuts for the extractors on and torqued them.
Also modified the s50 water pipes while we had a chance... as it sits in behind the engine between the firewall .. there is much room to move, but we have sussed it now
Finshed off now not hitting the number 6 pipe and now allows the heat shield to be put back on. Which is a wise move as a rubber hose sits on that pipe.
Also modified the steering rack so it has 3-4mm clearance from the sump

.. as I said before this whole thing has been very very tight.
Thats all .. we are now on the home run! .. next just bolting all the misc stuff to the engine and hanging the radiator etc etc. re-hang the exhaust that we took off earlier in the week

.. will photo it when its back on for ya'll to see.
and then itssssssssssss.. wiring time!

Will re-align the DME <-> EWS and we should be ready for the first test fire in the next week or so ...
