I've got my throttle bodies to finish (lots of laborious filing). Also ordered the tubing to make up the manifolds and entire exhaust system yesterday
Other than that, the end is drawing near, I've just got to install the fuel pump and main engine power relays for the Emerald, plus bung the connectors on the engine end of the loom and that's done!
Lastly, there's the front suspension and brakes to reinstall, and the lowering gubbins to go on the back.
Can't forkin' wait!
Hope everyone else's doing well!
Cheers!
Alex




