my goodies arrived today
.120 mls
arp headstuds
after reading the instructions im still a bit confussed
this is what i sort of summed up
put head studs into block tight by hand tight (with or without locktite?)
smire the bolts with the lub that came with the studs??
put headgasket on
puit head on
smire the nuts
torque head down the original way
then tourqe down to 60 ibft
leave for 30 min to hour
recheck tourque settings
i might be ok but i wanna be 100%
some one shed some light
thanks guys

