Work begins Sat 9th Feb.
Exhaust, heat shields and propshaft out.

Leaky open diff to be replaced with 3.91 LSD.

Fuel tank out but I snapped one of the fixing bolts above the rear beam so this is why the rear beam now needs to come out so that I can drill and re-tap.

Diff out.

I also need to sort the fixing for the brake line T piece from last year (currently held with a good 'ol tie wrap).

And finally rear beam out.

The areas of the chassis that I couldn't get to with all the parts fitted when I was doing the underseal last year will now be taken care of.


The alloy heat shield which goes under the prop tunnel will be cleaned up and re-used but the steel one which goes above the backbox is only good for the bin so I'm going to make a copy using alloy sheet.

New fuel tank which will get a couple of coats of paint on top of the manufacturers coat before it's installed.

New fuel tank protection plates painted and ready to fit.

That's pretty much where I am at the moment. The next stage will be pretty soul destroying cleaning up the rear beam, trailing arms, new diff etc. There's also a few minor bits of surface rust on the chassis that I need to deal with but hope fully all the boring stuff will be done by the time my new goodies arrive from the genuine parts dept.
Taylor.
























































